INSTALLATION
Removal / installation · Vehicles built from Jun 2009
Versions by build date: Oct 2006 – May 2009 from Jun 2009
| 1.
INSTALL TCM |
 |
Install the TCM to the transaxle.
- Install and tighten the 2 bolts in the order shown in the illustration.
-
Torque:
- 11 N*m{
112 kgf*cm
, 8 ft.*lbf
}
- Connect the connector to the TCM.
Turn the lock lever and secure the connector with the lock lever.
| 2.
INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
|
 |
- Install the intake air resonator with the bolt and clip.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
| 3.
INSTALL NO. 1 AIR CLEANER INLET
|
 |
- Install the No. 1 air cleaner inlet with the bolt.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
| 4.
INSTALL AIR CLEANER INLET ASSEMBLY
|
 |
- Install the air cleaner inlet with the clamp and 2 bolts.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
| 5.
INSTALL BATTERY
|
 |
- Install the battery and battery tray.
Install the battery clamp with the bolt and nut.
-
Torque:
- Bolt:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
- Nut:
- 3.5 N*m{
36 kgf*cm
, 31 in.*lbf
}
| 6.
INSTALL COOL AIR INTAKE DUCT SEAL
|
 |
- Install the intake duct seal with the 7 clips.
| 7.
PERFORM TCM REGISTRATION |
 |
- HINT:
-
Click here.