Speed Signal Circuit
Circuit diagnosis · Vehicles built Oct 2006 – May 2009
DESCRIPTION
The headlight leveling ECU receives the vehicle speed signal from the combination meter.- HINT:
- A voltage of 12 V or 5 V is output from each ECU and then input to the combination meter. The signal is changed to a pulse signal at the transistor in the combination meter. Each ECU controls the respective system based on the pulse signal.
- If a short occurs in any of the ECUs or in the wire harness connected to an ECU, all systems in the diagram below will not operate normally.
- A voltage of 12 V or 5 V is output from each ECU and then input to the combination meter. The signal is changed to a pulse signal at the transistor in the combination meter. Each ECU controls the respective system based on the pulse signal.
WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. CHECK COMBINATION METER SYSTEM |
The circuits that send vehicle speed signals to this system are inspected in the meter system (Click here).
During inspection for the meter section, if there is an instruction that indicates to go back inspections for each system, proceed to the next step.
| NEXT | |
| 2. CHECK HARNESS AND CONNECTOR (HEADLIGHT LEVELING ECU - COMBINATION METER) |
Disconnect the F2 combination meter connector.

Disconnect the A20 headlight leveling ECU connector.
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
Condition
Specified Condition
A20-16 (SPDR) - F2-12 (+S)
Always
Below 1 Ω
|
|
||||
| OK | ||
| ||
| 3. CHECK HARNESS AND CONNECTOR (HEADLIGHT LEVELING ECU - NO. 3 JUNCTION BLOCK) |
Disconnect the No. 3 J/B connector.
Measure the resistance according to the value(s) in the table below.


- Standard resistance:
Tester Connection
Condition
Specified Condition
3B-10 - A20-16 (SPDR)
Always
Below 1 Ω
|
|
||||
| OK | ||
| ||