2006-2011 Camry Aurion · Service Manual BODY ELECTRICAL

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. INSTALL GSM ANTENNA
  1. Install the GSM antenna.

  1. Install the 2 bolts.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. Connect the GSM antenna connector.


2. INSTALL PACKAGE TRAY TRIM PANEL ASSEMBLY (w/ Rear Sunshade)

HINT:
Follow the steps for installing the package tray trim panel assembly (Click here).


3. CONNECT BATTERY
  1. Connect the negative battery cable to the battery.


4. PLACE MAYDAY ECU IN ACTIVE MODE
  1. Using the diagnostic tool, place the mayday ECU into Active mode, refer to TDT System Functions (Click here).

    NOTICE:
    If the mayday ECU Service mode is not disabled, the system will not have full functionality.

← INSTALLATION (Oct 2006 – May 2009)PRECAUTION (Oct 2006 – May 2009) →