2006-2011 Camry Aurion · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Jun 2006 – Sep 2006

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL FLOOR SHIFT LEVER ASSEMBLY

  1. C132955
    Install the shift lever assembly with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

  1. C132954E01
    Connect the control cable to the shift lever retainer.

    NOTICE:
    1. The projecting part of the cable outer should face upward when the shift cable is connected.
    2. After installation, make sure that the cable outer lock is projecting from A as shown in the illustration.

  1. C132951E01
    Connect the end of the shift cable to the shift lever assembly with the clip.

  1. Connect the end of the select cable to the shift lever assembly with a new clip.

    NOTICE:
    1. The serrated part of the select cable point should face upward when the select cable point is connected.
    2. The clip should be installed in the direction as shown in the illustration.


3. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY

  1. B144604
    Engage the 3 claws and 5 clips to install the upper console rear panel sub-assembly.


4. INSTALL UPPER CONSOLE PANEL

  1. B145877
    Engage the 2 claws and the 5 clips to install the upper console panel as shown in the illustration.


5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  1. B144599
    Engage the 2 clips and install the No. 2 instrument cluster finish panel garnish.


6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH

  1. B144605
    Engage the 2 clips and install the No. 1 instrument cluster finish panel garnish.


7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY

  1. B152775
    Install the shift lever knob sub-assembly.

← REMOVAL (from Jun 2009)INSTALLATION (Oct 2006 – May 2009) →