Removal / installation · Vehicles built from Jun 2006
1.
INSTALL TIMING CHAIN CASE OIL SEAL
Apply MP grease to a new oil seal lip.
NOTICE:
Keep the lip free from foreign matter.
Using SST and a hammer, tap in the oil seal until its surface is flush with the rear oil seal retainer edge.
SST
09223-22010
NOTICE:
Wipe off extra grease from the crankshaft.
2.
INSTALL CRANKSHAFT PULLEY
Align the pulley set key with the key groove of the pulley.
Using SST, hold the pulley in place and tighten the bolt.
SST
09213-54015
(91651-60855)
09330-00021
Torque:
180 N*m{
1,835 kgf*cm
, 133 ft.*lbf
}
3.
INSTALL V-RIBBED BELT
Using SST and a 19 mm socket wrench, loosen the V-ribbed belt tensioner arm clockwise, then install the V-ribbed belt.
SST
09216-42010
NOTICE:
Be sure to connect SST and the tools so that they are in line during use.
When retracting the tensioner, turn it clockwise slowly for 3 seconds or more. Do not apply force rapidly.
After the tensioner is fully retracted, do not apply more force than necessary.
After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Check to confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.