2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. INSTALL STARTER ASSEMBLY

  1. A133864
    Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 380 kgf*cm , 28 ft.*lbf }

  1. Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the terminal 50 connector to the starter assembly.


2. INSTALL NO. 1 AIR CLEANER INLET

  1. A132970
    Install the No. 1 air cleaner inlet with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  1. A132971
    Install the air cleaner case with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum hose and hose clamp.


4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  1. A135706
    Install the air cleaner cap sub-assembly, and connect the 3 bands.

  1. A135705E01
    Connect the mass air flow meter connector (*1).

  1. Connect the No. 2 ventilation hose (*2).

  1. Connect the hose band (*3).

  1. A135704
    Connect the 3 vacuum hoses.


5. INSTALL AIR CLEANER INLET ASSEMBLY

  1. A132969
    Install the air cleaner inlet with the clamp and 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


6. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A140800
    Fit the 3 retainers and install the V-bank cover.


7. INSTALL COOL AIR INTAKE DUCT SEAL

  1. A141576E01
    Install the intake duct seal with the 7 clips.


8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.9 N*m{ 70 kgf*cm , 61 in.*lbf }

← INSTALLATION (Oct 2006 – May 2009)ON-VEHICLE INSPECTION (from Oct 2006) →