2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Oct 2006 – May 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. INSTALL NO. 1 VACUUM SWITCHING VALVE

  1. A132953
    Install the No. 1 vacuum switching valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. A132952E01
    Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.


2. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A140800
    Fit the 3 retainers and install the V-bank cover.

← INSPECTION (from Oct 2006)INSTALLATION (from Jun 2009) →