2006-2011 Camry Aurion · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A140800
    Hold the front of the V-bank cover and raise it to disengage the 2 clips on the front of the cover. Continue to raise the cover to disengage the clip on the rear of the cover and remove the cover.

    NOTICE:
    Attempting to disengage both front and rear clips at the same time may cause the cover to break.


2. REMOVE NO. 1 VACUUM SWITCHING VALVE

  1. A132952E01
    Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.

  1. A132953
    Remove the bolt and No. 1 vacuum switching valve.

← REMOVAL (Oct 2006 – May 2009)INSPECTION (from Oct 2006) →