BRAKE BOOSTER > REMOVAL |
| 1. DISCHARGE REFRIGERANT FROM REFRIGERATION (for RHD) |
Start up the engine.
Turn the A/C switch on.
Operate the cooler compressor at an engine speed of approximately 1,000 rpm for 5 to 6 minutes to circulate the refrigerant. This causes most of the compressor oil from the various components of the A/C system to collect in the A/C compressor.
Stop the engine.
Recover the refrigerant from the A/C system using a refrigerant recovery unit.
| 2. REMOVE ENGINE AND TRANSAXLE (for 2GR-FE RHD) |
| 3. DISCONNECT SUCTION PIPE SUB-ASSEMBLY (for RHD) |
![]() |
Remove the bolt, and slide the hook connector.
Disconnect the suction pipe sub-assembly.
Remove the O-ring from the suction hose sub-assembly.
| 4. DISCONNECT AIR CONDITIONING TUBE AND ACCESSORY (for RHD) |
Disconnect the air conditioning tube and accessory.
Remove the O-ring from the air conditioner tube and accessory.
| 5. SEPARATE BRAKE TUBE (for RHD) |
Using SST, disconnect the 6 brake lines from the actuator assembly with bracket.
Without VSC
With VSC
![]() |
Separate the brake line from the clamp.
| 6. REMOVE BRAKE PEDAL RETURN SPRING (for LHD) |
![]() |
Remove the brake pedal return spring.
| 7. REMOVE BRAKE PEDAL RETURN SPRING (for RHD) |
![]() |
Remove the brake pedal return spring.
| 8. SEPARATE BRAKE MASTER CYLINDER PUSH ROD CLEVIS |
![]() |
Remove the clip and push rod clevis pin, and separate the brake master cylinder push rod clevis from the brake pedal sub-assembly.
| 9. DISCONNECT NO. 2 VACUUM HOSE (for LHD) |
![]() |
Move the clip and disconnect the No. 2 vacuum hose.
| 10. REMOVE BRAKE MASTER CYLINDER SUB-ASSEMBLY |
| 11. DISCONNECT NO. 2 VACUUM HOSE (for 2AZ-FE RHD) |
![]() |
Move the clip and disconnect the No. 2 vacuum hose.
| 12. REMOVE BRAKE BOOSTER ASSEMBLY |
![]() |
Remove the 4 nuts and the brake booster assembly.
| 13. REMOVE BRAKE BOOSTER GASKET |
![]() |
Remove the brake booster gasket.
| 14. REMOVE BRAKE MASTER CYLINDER PUSH ROD CLEVIS |
Loosen the lock nut and remove the brake master cylinder push rod clevis.