DTC P0443 Evaporative Emission Control System Purge Control Valve Circuit |
| DTC No. | DTC Detection Condition | Trouble Area |
| P0443 | Both of the following conditions (a) and (b) are met (1 trip detection logic): (a) The target control value and actual control value do not match for 10 seconds or more. (b) The target control value and actual control value do not match for 80 times or more. |
|

| Tester Display | Description |
| NORMAL |
|
| ABNORMAL |
|
| INCOMPLETE |
|
| N/A |
|

| 1.PERFORM ACTIVE TEST USING INTELLIGENT TESTER (ACTIVATE THE VSV FOR EVAP CONTROL) |
![]() |
Disconnect the fuel vapor feed hose assembly (on the canister side) of the purge VSV.
| *1 | Purge VSV |
| *2 | Fuel Vapor Feed Hose Assembly (to Canister) |
Connect the intelligent tester to the DLC3.
Start the engine.
Turn the tester on.
Enter the following menus: Powertrain / Engine / Active Test / Activate the VSV for Evap Control.
When the purge VSV is operated using the tester, check whether the port of the purge VSV applies suction to your finger.
| Tester Operation | Specified Condition |
| ON | Purge VSV port applies suction to finger |
| OFF | Purge VSV port applies no suction to finger |
|
| ||||
| OK | ||
| ||
| 2.INSPECT PURGE VSV (RESISTANCE) |
Inspect the purge VSV (Click here).
|
| ||||
| OK | |
| 3.CHECK TERMINAL VOLTAGE (POWER SOURCE OF PURGE VSV) |
![]() |
Disconnect the purge VSV connector.
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| E50-1 - Body ground | Engine switch on (IG) | 11 to 14 V |
| *a | Front view of wire harness connector (to Purge VSV) |
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (PURGE VSV - ECM) |
Disconnect the purge VSV connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E50-2 - E26-48 (PRG) | Always | Below 1 Ω |
| E50-2 or E26-48 (PRG) - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | ||
| ||
| 5.CHECK HARNESS AND CONNECTOR (PURGE VSV - NO. 1 INTEGRATION RELAY) |
Disconnect the purge VSV connector.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E50-1 - 1A-8 | Always | Below 1 Ω |
| E50-1 or 1A-8 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | ||
| ||