SFI SYSTEM > ECM Power Source Circuit |

| 1.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY VOLTAGE) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| 1C-8 - Body ground | Ignition switch ON | 11 to 14 V |
| Result | Proceed to |
| OK | A |
| NG (w/o smart key system) | B |
| NG (w/ smart key system) | C |
|
| ||||
|
| ||||
| A | |
| 2.CHECK HARNESS AND CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1D-3 - Body ground | Always | 11 to 14 V |
| 1B-1 - Body ground | Always | 11 to 14 V |
|
| ||||
| OK | |
| 3.INSPECT NO. 1 INTEGRATION RELAY |
Inspect the No. 1 integration relay (Click here).
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1E-2 - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1C-1- A25-37 (IGSW) | Always | Below 1 Ω |
| 1C-9 - A25-2 (+B) | Always | Below 1 Ω |
| 1C-10 - A25-3 (+B2) | Always | Below 1 Ω |
| 1C-7 - A25-46 (MREL) | Always | Below 1 Ω |
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E26-16 (E1) - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | ||
| ||
| 7.CHECK HARNESS AND CONNECTOR (BATTERY - IGNITION SWITCH ASSEMBLY) |
Disconnect the ignition switch assembly connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| I36-5 (AM2) - Body ground | Always | 11 to 14 V |
|
| ||||
| OK | |
| 8.INSPECT IGNITION SWITCH ASSEMBLY |
Inspect the ignition switch assembly (Click here).
|
| ||||
| OK | ||
| ||
| 9.CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the certification ECU (smart key ECU assembly) connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A43-9 (IG2D) - 1C-8 | Always | Below 1 Ω |
|
| ||||
| OK | ||
| ||