Home › Engine / Hybrid System › 2GR-FE ENGINE CONTROL › CAMSHAFT OIL CONTROL VALVE
RM2030EQ _51 Engine / Hybrid System _014634 2GR-FE ENGINE CONTROL _0074395 CAMSHAFT OIL CONTROL VALVE A

2GR-FE ENGINE CONTROL  CAMSHAFT OIL CONTROL VALVE  INSTALLATION  


PROCEDURE

Hide 1.INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

a.
A090053
1.573,0.938 1.094,0.583 false 0.906,0.479 1.094,0.667 0.188,0.188 10 *1
*1 New O-ring


Apply a light coat of engine oil to 4 new O-rings and install them to the 4 camshaft timing oil control valve assemblies.


b.

Install the 4 oil control valves with the 4 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

NOTICE:

Make sure that each O-ring is not cracked or moved out of place during installation.



c.

Connect the 4 oil control valve connectors.


Hide 82121 2.CONNECT ENGINE WIRE

a.

Install the 2 wire harness brackets with the 2 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


b.

Connect the 3 wire harness clamps.


Hide 17190 3.INSTALL INTAKE AIR SURGE TANK ASSEMBLY