Home › Engine / Hybrid System › 2GR-FE ENGINE CONTROL › ECM
RM2030EQ _51 Engine / Hybrid System _014634 2GR-FE ENGINE CONTROL _0074399 ECM A

2GR-FE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89667E 1.INSTALL NO. 1 ECM BRACKET

a.

Install the No. 1 ECM bracket with the nut.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


b.

Connect the 2 wire harness clamps.


c.

Install the nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 89661 2.INSTALL ECM

a.

Install the No. 2 ECM bracket to the ECM with the 2 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

Temporarily install the screw (B).


c.
A254792E01
2.49,0.74 2.615,0.896 0.125,0.156 10 A 2.396,1.198 2.521,1.354 0.125,0.156 10 B

Install the ECM with the nut.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


d.

Install the screw (A).

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


e.

Tighten the screw (B).

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


f.

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connecting parts.

·

Make sure that the 2 levers are securely locked.




Hide 53295E 4.INSTALL COOL AIR INTAKE DUCT SEAL

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable from the negative (-) battery terminal, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION