25860A 1.INSTALL PURGE VSV
Install the purge VSV with the bolt.
Connect the 2 fuel vapor feed hoses.
Connect the wire harness clamp and connector.
11209 2.INSTALL V-BANK COVER SUB-ASSEMBLY
Click hereEngine / Hybrid System>2GR-FE ENGINE MECHANICAL>ENGINE ASSEMBLY>INSTALLATION