The SMRs (System Main Relays) are the relays that connect or disconnect the high voltage power system in accordance with commands from the power management control ECU.
There are 3 SMRs and 1 precharge resistor. SMRB, SMRP, SMRG, and the precharge resistor are located in the hybrid battery junction block assembly in the HV battery pack.
To connect to the high voltage power system, the vehicle will first turn on SMRP and SMRB to charge the vehicle through the system main resistor. Then, SMRP will be turned off after SMRG is turned on. To shut off the high voltage power system, SMRB and SMRG are turned off.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | MIL | Warning Indicate |
|---|---|---|---|---|---|
| P0AE6-225 | Hybrid Battery Precharge Contactor Control Circuit Low | Short to GND in the SMRP circuit | ·
Wire harness or connector ·
Hybrid battery junction block assembly ·
Power management control ECU |
Does not come on | Master Warning Light:
Comes on |
Before inspecting the high-voltage system or disconnecting the low voltage connector of the inverter with converter assembly, take safety precautions such as wearing insulated gloves and removing the service plug grip to prevent electrical shocks. After removing the service plug grip, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.
After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work (See pageEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID CONTROL SYSTEM>PRECAUTION).
Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.
After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
If P0AE6-225 is stored, the vehicle cannot be started.
Disconnect connector I3 from the power management control ECU.
| *a | Rear view of wire harness connector
(to Power Management Control ECU) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| I3-3 (SMRP) - Body ground | Power switch off | 112 to 274 Ω |
Connect the power management control ECU connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Be sure to wear insulated gloves.
Check that the service plug grip is not installed.
After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.
Remove the No. 4 hybrid battery shield panel (Click here Engine / Hybrid System>HYBRID / BATTERY CONTROL>HV RELAY ASSEMBLY>REMOVAL).
Disconnect connector O9 from the hybrid battery junction block assembly.
Disconnect connector I3 from the power management control ECU.
| *a | Rear view of wire harness connector
(to Power Management Control ECU) |
| *b | Rear view of wire harness connector
(to Hybrid Battery Junction Block Assembly) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| I3-3 (SMRP) and O9-4 (SMRP) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
Connect the power management control ECU connector.
Connect the hybrid battery junction block assembly connector.
Install the No. 4 hybrid battery shield panel.
| Proceed to |
|---|
| OK |
| NG |
OK
NG