Home › Engine / Hybrid System › 2AR-FXE ENGINE CONTROL › SFI SYSTEM (w/ EGR System)

SFI SYSTEM (w/ EGR System) > Fuel Pump Control Circuit

for Preparation Click here


DESCRIPTION

When the engine is cranked, the start request signal output from the power management control ECU is input to the ECM, and the NE signal generated by the crankshaft position sensor is also input to the NE+ terminal. Thus, the ECM interprets that the engine has been cranked, and turns transistor Tr1 in the ECM internal circuit on. Current flows to the C/OPN (Circuit Opening) relay by turning Tr1 on. Then, the fuel pump operates.
While the NE signal is input to the ECM with the engine running, the ECM turns Tr1 on continuously.

WIRING DIAGRAM


A315314E01


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

1.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP / SPEED)
  1. Connect the GTS to the DLC3.

  1. Turn the power switch on (IG).

  1. Turn the GTS on.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.

  1. Check whether the fuel pump operating sounds occur when performing the Active Test on the GTS.

    Result 
    Result
    Proceed to
    Fuel pump operating sound does not occur
    A
    Fuel pump operating sound occurs
    B



B
Go to step 7
A


2.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1E-1 - A25-21 (FC)
    Always
    Below 1 Ω
    1E-1 or A25-21 (FC) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - FUEL PUMP)
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Disconnect the fuel pump connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1C-6 - N11-4 (B)
    Always
    Below 1 Ω
    1C-6 or N11-4 (B) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


4.CHECK HARNESS AND CONNECTOR (FUEL PUMP - BODY GROUND)
  1. Disconnect the fuel pump connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    N11-5 (E) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.INSPECT FUEL PUMP
  1. Inspect the fuel pump (Click here).

    HINT:
    Perform "Inspection After Repair" after replacing the fuel pump (Click here).



NG
REPLACE FUEL PUMP (Click here)
OK


6.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)


    A256530E06
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1D-1 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (AUXILIARY BATTERY - NO. 1 INTEGRATION RELAY)
OK

REPLACE NO. 1 INTEGRATION RELAY (Click here)  

7.READ VALUE USING GTS (STARTER SIGNAL)
  1. Connect the GTS to the DLC3.

  1. Turn the power switch on (IG).

  1. Turn the GTS on.

  1. Put the engine in inspection mode (maintenance mode) (Click here).

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.

  1. Check the result when the power switch on (IG) and the engine starts.

    OK 
    Condition
    Starter Signal
    Power switch on (IG)
    Close (OFF)
    Engine started
    Open (ON)



NG
GO TO HYBRID CONTROL SYSTEM (Click here)
OK


8.READ VALUE USING GTS (ENGINE SPEED)
  1. Connect the GTS to the DLC3.

  1. Turn the power switch on (IG).

  1. Turn the GTS on.

  1. Put the engine in inspection mode (maintenance mode) (Click here).

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Engine Speed.

  1. Read the values displayed on the GTS while cranking.

    OK:
    Values are displayed continuously.



NG
CHECK CRANKSHAFT POSITION SENSOR CIRCUIT (Click here)
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)