Home › Engine / Hybrid System ยท 2GR-FE › ENGINE CONTROL › ECM

ECM > INSTALLATION

for Preparation Click here



1. INSTALL NO. 1 ECM BRACKET
  1. Install the no. 1 ECM bracket with the nut.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Connect the 2 wire harness clamps.

  1. Install the nut.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



2. INSTALL ECM
  1. Install the no. 2 ECM brackets to the ECM with the 2 screws.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. Temporarily install the screw (B).



    A254792E01
  1. Install the ECM with the nut.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the screw (A).

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. Tighten the screw (B).

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }

  1. Connect the 2 ECM connectors and lower the 2 levers.

    NOTICE:
    1. When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other part.
    2. Make sure that the 2 levers are securely locked.



3. INSTALL BATTERY
  1. Install the battery and battery tray.

  1. Install the battery clamp with the bolt and nut.

    Torque:
    Bolt:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
    Nut:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }

  1. Connect the positive (+) cable to the positive (+) battery terminal.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }



4. INSTALL COOL AIR INTAKE DUCT SEAL
  1. Install the cool air intake duct seal with the 9 clips.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



6. PERFORM INITIALIZATION
(Click here).