THROTTLE BODY > INSTALLATION |
| 1. INSTALL THROTTLE BODY GASKET |
![]() |
Install a new throttle body gasket to the intake manifold with the protrusion of the throttle body gasket oriented as shown in the illustration.
| *a | Protrusion |
| 2. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY |
Connect the No. 2 water by-pass hose and No. 3 water by-pass hose to the throttle body with motor assembly and slide the 2 clips to secure them.
Install the throttle body with motor assembly to the intake manifold with the 4 bolts.
Connect the throttle body with motor assembly connector.
| 3. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE |
Connect the air cleaner cap with air cleaner hose to the throttle body with motor assembly.
Install the air cleaner cap with air cleaner hose with the 2 guides and 2 air cleaner cap clamps.
Tighten the hose clamp.
Connect the union to connector tube hose to the air cleaner hose sub-assembly.
Engage the wire harness clamp.
Connect the mass air flow meter sub-assembly connector.
Engage the ventilation hose clamp.
Connect the ventilation hose to the cylinder head cover sub-assembly and slide the clip to secure it.
| 4. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
Slowly fill the radiator assembly with engine coolant.
Remove the reserve tank cap.
Slowly pour engine coolant into the radiator reserve tank assembly until it reaches the full line.
Squeeze the No. 1 radiator hose and No. 2 radiator hose several times by hand, and then check the level of the engine coolant.
If the engine coolant level is low, add engine coolant.
Install the radiator cap sub-assembly and reserve tank cap.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the engine coolant for several minutes.
Maintain the engine speed at 2500 to 3000 rpm.
Squeeze the No. 1 radiator hose and No. 2 radiator hose several times by hand to bleed air from the cooling system.
Stop the engine, and wait until the engine coolant cools down.
Add engine coolant to the full line on the radiator reserve tank assembly.
| 5. INSPECT FOR COOLANT LEAK |
Remove the radiator cap sub-assembly.
![]() |
Fill the radiator assembly with engine coolant, and then install a radiator cap tester.
| *a | Radiator Cap Tester |
Warm up the engine.
Pump the radiator cap tester to 118 kPa (1.2 kgf/cm2, 17 psi), and then check that the pressure does not drop.
Remove the radiator cap tester.
Install the radiator cap sub-assembly.
| 6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
Engage the 3 grommets to install the No. 1 engine cover sub-assembly.
| 7. PERFORM INITIALIZATION |
Connect the GTS to the DLC3.
Clear the DTCs (Click here).
Perform "Inspection After Repair" (Click here).
Start the engine and check that the MIL is not illuminated. After the engine is warmed up, check that the idle speed is within the specified range with the A/C switch off.
Enter the following menus: Powertrain / Engine / Data List / Throttle Sensor Position.
Fully depress the accelerator pedal and check that the value is 60% or higher.
Perform a road test and confirm that there are no abnormalities.