Home › General › MAINTENANCE › BRAKE VACUUM HOSE (for LHD) › 2017.09–2018.04
RM33A0E _V1 General _065356 MAINTENANCE _0327421 BRAKE VACUUM HOSE(for LHD) A

MAINTENANCE  BRAKE VACUUM HOSE(for LHD)  INSTALLATION  


PROCEDURE

Hide 44763A 1.INSTALL NO. 1 HOSE TO HOSE TUBE (for 2AR-FE)

a.
C375960

Install the No. 1 hose to hose tube with the 2 nuts.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


Hide 44774 2.INSTALL UNION TO CONNECTOR TUBE HOSE (for 2AR-FE)

a.

Install the 2 clips to the union to connector tube hose.


b.
C375963C01
0.854,1.146 0.854,0.969 true 0.823,0.781 0.635,0.542 0.635,0.542 0.521,0.542 true 2.948,3.896 2.625,3.896 true 0.354,0.458 0.51,0.615 0.156,0.156 10 true *1 0.781,1.146 0.958,1.313 0.177,0.167 10 true *a 2.958,3.813 3.135,3.979 0.177,0.167 10 true *a
*1 Vacuum Hose Clamp
*a Paint Mark


Connect the union to connector tube hose to the intake manifold and slide the clip to secure it.

NOTICE:
·

When connecting the union to connector tube hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




c.

Install the union to connector tube hose to the vacuum hose clamp.

NOTICE:

When installing the union to connector tube hose to the vacuum hose clamp, make sure to align the paint mark with the vacuum hose clamp as shown in the illustration.



d.
C375959C01
0.813,0.76 1.333,0.76 true 0.635,0.677 0.823,0.844 0.188,0.167 10 true *a
*a Paint Mark


Connect the union to connector tube hose to the No. 1 hose to hose tube and slide the clip to secure it.

NOTICE:
·

When connecting the union to connector tube hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing the left side of the vehicle.




Hide 44772 3.INSTALL CHECK VALVE TO CONNECTOR TUBE HOSE (for 2AR-FE)

a.

Install the 2 clips to the check valve to connector tube hose.


b.
C375958C01
0.896,1.073 1.448,1.073 true 2.073,0.906 2.625,0.906 true 0.719,1 0.896,1.156 0.177,0.156 10 true *a 2.646,0.823 2.823,0.979 0.177,0.156 10 true *a
*a Paint Mark


Connect the check valve to connector tube hose to the No. 1 hose to hose tube and slide the clip to secure it.

NOTICE:
·

When connecting the check valve to connector tube hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




c.

Connect the check valve to connector tube hose to the brake booster assembly and slide the clip to secure it.

NOTICE:
·

When connecting the check valve to connector tube hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




Hide 44777 4.INSTALL NO. 1 VACUUM HOSE CONNECTOR (for A25A-FKS)

a.

Align the No. 1 vacuum hose connector with the vacuum pump assembly, and push them together until the No. 1 vacuum hose connector makes a "click" sound.

NOTICE:
·

Check that there is no foreign matter on the connecting parts.

·

After connecting the No. 1 vacuum hose connector, check that the vacuum pump assembly and No. 1 vacuum hose connector are securely connected by pulling on them.




b.

Connect the vacuum hose to the No. 1 vacuum hose connector.


Hide 44773F 5.INSTALL UNION TO CHECK VALVE HOSE (for A25A-FKS)

a.

Install the 2 clips to the union to check valve hose.


b.
C373424C01
1.354,1.271 2.125,1.271 true 2.135,1.188 2.302,1.375 0.167,0.188 10 true *a
*a Paint Mark


Connect the union to check valve hose to the No. 1 vacuum hose connector and slide the clip to secure it.

NOTICE:
·

When connecting the union to check valve hose, face the paint mark up.

·

Make sure that the tabs of the clip is facing the back of the vehicle.




c.
C373425C01
2.083,1.26 1.823,1.26 1.823,1.26 1.823,0.844 true 2.094,1.177 2.271,1.354 0.177,0.177 10 true *a
*a Paint Mark


Connect the union to check valve hose to the brake booster assembly and slide the clip to secure it.

NOTICE:
·

When connecting the union to check valve hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




Hide 17361M 6.INSTALL AIR TUBE (for 2GR-FKS)

a.
C375951

Engage the clamp to install the air delivery way to the intake air surge tank assembly.


b.

Install the 2 clips to the air tube.


c.
C380328C01
0.74,3.052 0.969,3.052 0.969,3.052 0.969,2.646 true 2.25,2.708 2.604,2.708 true 0.583,2.979 0.896,3.135 0.313,0.156 10 false *a 2.094,2.635 2.406,2.792 0.313,0.156 10 false *a 2.542,2.125 3,2.323 0.458,0.198 10 false 45°
*a Paint Mark


Connect the air tube to the air delivery way and slide the clip to secure it.

NOTICE:
·

Make sure to position the paint mark of the air tube as shown in the illustration.

·

Make sure that the tabs of the clip are aligned as shown in the illustration.




d.
C380329C01
1.625,3.469 1.833,3.469 1.833,3.469 2.01,3.906 true 1.396,0.552 1.167,0.552 1.167,0.552 0.969,0.823 true 2.188,0.865 2.583,0.865 true 1.479,3.406 1.792,3.563 0.313,0.156 10 false *a 1.427,0.49 1.74,0.646 0.313,0.156 10 false *b 2.031,0.802 2.344,0.958 0.313,0.156 10 false *b 2.521,0.292 2.979,0.49 0.458,0.198 10 false 45°
*a Paint Mark
*b Dot Paint


Connect the air tube to the vacuum pump assembly and slide the clip to secure it.

NOTICE:
·

Make sure to position the paint mark of the air tube as shown in the illustration.

·

Make sure that the tabs of the clip are aligned as shown in the illustration.




e.
C375948

Connect the 2 vacuum transmitting hose assemblies to the air delivery way.


Hide 44773F 7.INSTALL UNION TO CHECK VALVE HOSE (for 2GR-FKS)

a.

Install the 2 clips to the union to check valve hose.


b.
C375945C01
1.802,1.063 1.958,0.646 1.958,0.646 2.188,0.646 true 2.198,0.563 2.406,0.74 0.208,0.177 10 true *a
*a Paint Mark


Connect the union to check valve hose to the air delivery way and slide the clip to secure it.

NOTICE:
·

When connecting the union to check valve hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




c.
C375944C01
1.708,1.021 2.208,1.021 true 2.229,0.948 2.406,1.104 0.177,0.156 10 true *a
*a Paint Mark


Connect the union to check valve hose to the brake booster assembly and slide the clip to secure it.

NOTICE:
·

When connecting the union to check valve hose, face the paint mark up.

·

Make sure that the tabs of the clip are facing upward.




d.
C375943

Engage the clamp to install the union to check valve hose to the air tube.


Hide 53607A 8.INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY (for 2AR-FE, 2GR-FKS)

Hide 55708 9.INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (for 2AR-FE, 2GR-FKS)