Home › Engine / Hybrid System › 6AR-FSE (STARTING) › ENGINE SWITCH › 2018.04–2021.02
RM33A0E _51 Engine / Hybrid System _072209 6AR-FSE STARTING _0351491 ENGINE SWITCH A

6AR-FSE STARTING  ENGINE SWITCH  INSTALLATION  


PROCEDURE

Hide 89611 1.INSTALL ENGINE SWITCH

a.

Engage the 2 claws to install the engine switch to the lower instrument panel finish panel assembly.


Hide 55480D 2.INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY

Hide 55435B 3.INSTALL NO. 1 METER HOOD CLUSTER