Home › Engine / Hybrid System › 6AR-FSE (EMISSION CONTROL) › PCV VALVE › 2018.04–2021.02
RM33A0E _51 Engine / Hybrid System _072205 6AR-FSE EMISSION CONTROL _0353752 PCV VALVE A

6AR-FSE EMISSION CONTROL  PCV VALVE  INSTALLATION  


PROCEDURE

Hide 12204 1.INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)

a.

Clean and degrease the threads of the PCV valve (ventilation valve sub-assembly).


b.

Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



c.

Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly.

Torque:
27 N*m (275 kgf*cm, 20 ft.*lbf)

NOTICE:

Do not start the engine for at least 1 hour after installation.



Hide 12262 2.CONNECT NO. 2 VENTILATION HOSE

a.

Connect the No. 2 ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.


Hide 12601B 3.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY