The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EGR cooler assembly removal/installation are shown below.
After the ignition switch is turned off, the radio and display receiver assembly records various types of memory and settings. As a result, after turning the ignition switch off, make sure to wait at least 85 seconds before disconnecting the cable from the negative (-) battery terminal.
This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
1.DRAIN ENGINE COOLANT
12601B
2.REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY
3.REMOVE AIR CLEANER CAP WITH AIR CLEANER HOSE
4.REMOVE BATTERY
82121
5.DISCONNECT ENGINE WIRE
Remove the 3 bolts.
Disconnect the 4 connectors.
Disengage the wire harness clamp and disconnect the engine wire.
Disconnect the 6 connectors.
Disengage the 3 wire harness clamps and disconnect the engine wire.
Disengage the wire harness clamp.
Remove the bolt and 2 nuts.
Disconnect the 4 connectors.
Disengage the wire harness clamp and disconnect the engine wire.
25680
6.REMOVE EGR COOLER ASSEMBLY
| *1 | No. 3 Water By-pass Hose |
| *2 | No. 4 Water By-pass Hose |
Slide the 2 clips and disconnect the No. 3 water by-pass hose and No. 4 water by-pass hose from the EGR cooler assembly.
Using an 8 mm socket wrench, remove the 2 bolts and wire harness clamp bracket from the EGR cooler assembly.
|
Bolt |
|
Nut |
|
Bolt or Nut |
Type A:
Remove the 3 bolts, 2 nuts and EGR cooler assembly from the cylinder head sub-assembly and EGR valve assembly.
Type B:
Remove the 2 bolts, 3 nuts and EGR cooler assembly from the cylinder head sub-assembly and EGR valve assembly.
| *1 | EGR Valve Gasket |
| *2 | EGR Cooler Gasket |
Remove the EGR valve gasket from the EGR cooler assembly.
Remove the EGR cooler gasket from the EGR cooler assembly.