1. ASSEMBLE INJECTION NOZZLES
Assemble the nozzle holder body, adjusting shim. pressure spring, pressure pin, distance piece, the nozzle assembly and nozzle holder retaining nut, and finger tighten the nut.
Align the holes of the nozzle body, distance piece and nozzle holder body.
Using a 14 mm deep socket wrench, torque the retaining nut.
29 N*m (300 kgf*cm, 22 ft.*lbf)
2.PERFORM PRESSURE AND SPRAY PATTERN TEST