15708
1.INSTALL OIL NOZZLE
Install a new O-ring to the oil nozzle.
Apply a light coat of engine oil on the O-ring.
Align the head point of the oil nozzle with the alignment mark of the cylinder block.
Using a brass bar and hammer, tap in the 4 nozzles.
2.INSTALL CHECK VALVE
Install a new gasket and the check valve.
35 N*m (357 kgf*cm, 26 ft.*lbf)
22100
3.INSTALL INJECTION PUMP