22100
1.INSTALL INJECTION PUMP
Do not put the injection pump at an angle more than 45° from the horizontal.
Install a new O-ring to the pump.
Apply a light coat of engine oil on the O-ring.
Align the spline toothless portions of the injection pump and injection pump drive gear, and install the injection pump.
Align the matchmark of the injection pump flange and timing gear case.
Install the injection pump with the 2 nuts.
19 N*m (190 kgf*cm, 14 ft.*lbf)
Install the injection pump stay with the 4 bolts.
29 N*m (295 kgf*cm, 21 ft.*lbf)
38 N*m (380 kgf*cm, 27 ft.*lbf)
Connect the accelerator cable (15B-FT) or accelerator link (Others) to the injection pump.
Connect the injection pump connector.
2.CHECK INJECTION TIMING
3.CONNECT HOSES
w/ ACSD:
Connect the water bypass pipe to the intake manifold with the 2 bolts.
w/ ACSD:
Connect the 2 water bypass hoses to the thermo wax.
Connect these hoses:
2 fuel return hoses
BU:
Vacuum hose (for PS idle-up)
BU:
Vacuum hose (for A/C idle-up)
15B-FT:
Boost compensator hose
4.INSTALL INJECTION PIPES
5.FILL RADIATOR WITH ENGINE COOLANT (w/ ACSD)
6.FILL INJECTION PUMP WITH FUEL
Operate the priming pump until you feel more resistance.
7.BLEED INJECTION NOZZLES
Loosen all union nuts of the injection pipe on the nozzle side.
Crank the engine to bleed air and force out the fuel from the injection pipe.
8.START ENGINE AND CHECK FOR FUEL LEAKS
9.CHECK ENGINE IDLE SPEED AND MAXIMUM SPEED
10.RECHECK COOLANT LEVEL (w/ ACSD)