After replacing the turbocharger assembly, pour approx. 20 cc (1.2 cu in.) of new oil into the oil inlet and turn the impeller wheel by hand to splash oil on the bearing.
1.INSTALL TURBINE OUTLET ELBOW
Install a new gasket and the turbine outlet elbow with the four nuts.
530 kg*cm (38 ft*lb, 52 N*m)
2.INSTALL NO.1 TURBO WATER PIPE
Install a new gasket and the water pipe with the two nuts.
80 kg*cm (69 in.*lb, 7.8 N*m)
3.INSTALL NO.2 TURBO HEAT INSULATOR
Install the No.2 turbo heat insulator with the two bolts.
80 kg*cm (69 in.*lb, 7.8 N*m)
4.ASSEMBLE TURBOCHARGER AND EXHAUST MANIFOLD
Install a new gasket and the turbocharger to the exhaust manifold with the four nuts.
530 kg*cm (38 ft*lb, 52 N*m)
5.INSTALL TURBOCHARGER AND EXHAUST MANIFOLD ASSEMBLY
Install two new gaskets to the cylinder head.
Install the turbocharger and exhaust manifold assembly with the twelve nuts.
400 kg*cm (29 ft*lb, 39 N*m)
Apply 330 kg*cm (24 ft*lb, 32 N*m) of torque when performing additional tightening of loosed nuts.
6.INSTALL TURBO OIL PIPE
Install a new gasket and the turbo oil pipe with the two nuts.
185 kg*cm (13 ft*lb, 18 N*m)
Connect the turbo oil hose.
Install two new gaskets and the union bolt of the turbo oil pipe.
250 kg*cm (18 ft*lb, 25 N*m)
7.INSTALL TURBOCHARGER STAY
Install the turbocharger stay with the three bolts.
1,200 kg*cm (87 ft*lb, 118 N*m)
8.INSTALL TURBOCHARGER HEAT INSULATOR
Install the heat insulator with the two bolts.
185 kg*cm (13 ft*lb, 18 N*m)
9.CONNECT WATER BY-PASS HOSES
17167
10.INSTALL EXHAUST MANIFOLD HEAT INSULATOR
Install the heat insulator with the five bolts.
185 kg*cm (13 ft*lb, 18 N*m)
17113
11.INSTALL INTAKE PIPE
Connect the air hose and install a new gasket and the intake pipe with the three bolts.
200 kg*cm (14 ft*lb, 20 N*m)
Connect boost compensator vacuum hose.
12.FILL ENGINE WITH COOLANT
13.START ENGINE AND CHECK FOR LEAKS
14.CHECK ENGINE OIL LEVEL