Home › Engine / Hybrid System › N04C-UH (CHARGING) › GENERATOR
RM2850E _51 Engine / Hybrid System _073313 N04C-UH CHARGING _0357078 GENERATOR A

N04C-UH CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Temporarily install the generator assembly onto the engine.


b.
A149666

Install the generator bracket with the 2 bolts.

Torque:

125 N*m (1275 kgf*cm, 92 ft.*lbf)



c.

Install the generator assembly with the 2 bolts.

Torque:

55 N*m (561 kgf*cm, 41 ft.*lbf)



d.

Install the 2 wire harnesses with the 2 bolts to the generator bracket.

Torque:

8.0 N*m (82 kgf*cm, 71 in.*lbf)



e.

Connect the connector to the generator assembly.


f.

Install the wire harness to terminal B with the nut, and install the terminal cap.

Torque:

10 N*m (102 kgf*cm, 7 ft.*lbf)



g.

Connect the 4 wire harness clamps.


Hide 16206C 3.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY

Hide 16701 4.INSTALL FAN SHROUD SUB-ASSEMBLY

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:

3.9 N*m (40 kgf*cm, 35 in.*lbf)