84720A
1.INSTALL NO. 1 PATTERN SELECT SWITCH ASSEMBLY (FIRST HOLD SWITCH)
Attach the 2 claws to install the No. 1 pattern select switch assembly (first hold switch) to the instrument cluster finish panel garnish assembly.
55470
2.INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
55412D
3.INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL
86250
4.INSTALL AMPLIFIER MICROPHONE ASSEMBLY
55433B
5.INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL
58841A
6.INSTALL SHIFTING HOLE COVER