1.INSTALL 2 RECEIVERS IN RECEIVER HOLDER
Do not remove the blind plugs until ready for connection.
2.CONNECT 4 LIQUID TUBES TO RECEIVERS
5.5 N*m (55 kgf*cm, 48 in.*lbf)
3.INSTALL CONDENSER AIR INLET COVER
Install the cover with the 8 screws.
4. IF RECEIVER WAS REPLACED, ADD COMPRESSOR OIL TO COMPRESSOR
Add 20 cc (0.71 fl.oz.)
ND-OILS
5. EVACUATE AIR FROM REFRIGERATION SYSTEM
6. CHARGE SYSTEM WITH REFRIGERANT AND INSPECT FOR LEAKAGE OF REFRIGERANT
1800 +/-50 g (60.9 +/-1.8 oz)
7. CHARGE REFRIGERANT
8. WARM UP ENGINE
9.INSPECT FOR REFRIGERANT LEAK