Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
84170A
1.INSTALL NO. 1 ROOM LIGHT SWITCH ASSEMBLY
Attach the 2 claws to install the No. 1 room light switch assembly to the instrument cluster finish panel garnish assembly.
84170B
2.INSTALL NO. 2 ROOM LIGHT SWITCH ASSEMBLY
Attach the 2 claws to install the No. 2 room light switch assembly to the instrument cluster finish panel garnish assembly.
55470
3.INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH ASSEMBLY
55412D
4.INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL
58848A
5.INSTALL SHIFT LEVER HOLE COVER (for Manual Transmission)
Install the shift lever hole cover with the 4 bolts.
58286
6.INSTALL NO. 1 SHIFT AND SELECT LEVER BOOT (for Manual Transmission)
for RHD:
Install the No. 1 shift and select lever boot with the 3 bolts.
for LHD:
Install the No. 1 shift and select lever boot with the 4 bolts.
58534A
7.INSTALL TRANSMISSION COVER MAT (for Manual Transmission)
Install the transmission cover mat to the shift and select lever support.
33504F
8.INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transmission)
Gently rotate the shift lever knob sub-assembly by hand until it locks.
After locking, further tighten by 1.5 turns.
After tightening, rotate and adjust the tightened direction so that the shift pattern is positioned within +/-10° of the front of the vehicle.
58841A
9.INSTALL SHIFTING HOLE COVER (for Automatic Transmission)
55433B
10.INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL