45407
1.INSPECT TIE ROD END SUB-ASSEMBLY LH
Move the ball joint stud back and forth 5 times as shown in the illustration, before installing the nut.
Using a torque wrench, turn the nut continuously at a rate of 2 to 4 seconds per turn and take the torque reading on the fifth turn.
0.98 to 3.92 N*m (9.6 to 38.4 kgf*cm, 8.67 to 34.7 in.*lbf)
45046
2.INSPECT TIE ROD END SUB-ASSEMBLY RH
Use the same procedures described for the LH side.
3.INSPECT TOTAL PRELOAD
Temporarily install the left and right steering rack ends to prevent steering rack overstroke.
Using SST and a torque wrench, inspect the preload.
0.7 to 1.25 N*m (7.1 to 12.7 kgf*cm, 6.2 to 11.06 in.*lbf)
If the preload is not as specified, replace the new power steering gear assembly.