Home › Engine / Hybrid System › 2GR-FE STARTING › STARTER
RM24M0E _51 Engine / Hybrid System _059574 2GR-FE STARTING _0292068 STARTER A

2GR-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 28100 1.INSTALL STARTER ASSEMBLY

a.
A160233

Install the starter with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


b.
A160240

Install the wire harness clamp bracket with the bolt.

Torque:
8.4 N*m (86 kgf*cm, 74 in.*lbf)


c.
A160232

Connect the starter connector.


d.

Install the terminal nut and cover the nut with the cap.

Torque:
9.8 N*m (100 kgf*cm, 7 ft.*lbf)


Hide 74414D 2.INSTALL BATTERY BRACKET REINFORCEMENT

a.
A160231

Install the bracket reinforcement with the 2 bolts.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


Hide 74411 3.INSTALL FRONT BATTERY BRACKET

a.
A160234

Insert the No. 2 air cleaner inlet to the bracket with the bolt.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


b.
A160236

Install the front bracket with the 4 bolts.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


c.

Attach the 2 wire harness clamps.


Hide 74431 4.INSTALL BATTERY TRAY

Hide 28800 5.INSTALL BATTERY

Hide 28899 6.INSTALL BATTERY INSULATOR

Hide 74404B 7.INSTALL BATTERY CLAMP

a.
A160229

Attach the hook of the battery clamp to the front battery bracket.


b.

Temporarily install the nut and bolt.


c.

Adjust the battery clamp's position.


d.

Tighten the nut and bolt.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


e.

Attach the 2 wire harness clamps.


Hide 53292A 8.INSTALL UPPER RADIATOR SUPPORT SEAL

Hide 9.CONNECT CABLE TO POSITIVE BATTERY TERMINAL

Hide 10.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL