Home › Vehicle Interior › EXTERIOR › ROOF DRIP SIDE FINISH MOULDING
RM24M0E _58 Vehicle Interior _059595 EXTERIOR _0292240 ROOF DRIP SIDE FINISH MOULDING A

EXTERIOR  ROOF DRIP SIDE FINISH MOULDING  INSTALLATION  


PROCEDURE

Hide 75552E 1.INSTALL ROOF DRIP SIDE FINISH MOULDING

a.

When exchanging the clips

i.

Remove the tape that remains on the mounting surface of the vehicle body and then clean the surface with non-residue solvent.


ii.

Using a heat light, heat up the clip installation surfaces of the vehicle body and moulding.

Standard heating temperature:
Item Specified Condition
Body 40 to 60°C (104 to 140°F)
Moulding 20 to 30°C (68 to 86°F)


NOTICE:

Do not heat the body and moulding excessively.



iii.

Set the supplied clips in the positions shown in the illustration and press-fit the clips by hand to install them.

NOTICE:

Install the moulding when 30 minutes or more have passed after press-fitting the clips.


HINT:
B141122E02
0.083,0.094 0.844,0.24 0.76,0.146 10 false Front Side: 0.135,2.302 0.917,2.448 0.781,0.146 10 false Rear Side: 0.531,0.542 1.229,0.917 0.698,0.375 10 false 27.5 mm (1.083 in.) 2,2.896 2.677,3.271 0.677,0.375 10 false 32.1 mm (1.264 in.)

·

Installation hardening time: 30 minutes

·

Complete hardening time: 24 hours





b.

Install the roof drip side finish moulding.