75552E
1.INSTALL ROOF DRIP SIDE FINISH MOULDING
When exchanging the clips
Remove the tape that remains on the mounting surface of the vehicle body and then clean the surface with non-residue solvent.
Using a heat light, heat up the clip installation surfaces of the vehicle body and moulding.
| Item | Specified Condition |
|---|---|
| Body | 40 to 60°C (104 to 140°F) |
| Moulding | 20 to 30°C (68 to 86°F) |
Do not heat the body and moulding excessively.
Set the supplied clips in the positions shown in the illustration and press-fit the clips by hand to install them.
Install the moulding when 30 minutes or more have passed after press-fitting the clips.
Installation hardening time: 30 minutes
Complete hardening time: 24 hours
Install the roof drip side finish moulding.