2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. INSTALL MASS AIR FLOW METER

  1. G036119E01
    Install the mass air flow meter with 2 screws.

  1. Connect the connector.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }


3. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (from Aug 2009)INSTALLATION (from Aug 2009) →