2011-2016 FJ Cruiser · Service Manual TRANSMISSION

REASSEMBLY

Removal / installation · Vehicles built from Jul 2007


1. INSTALL SHIFT SOLENOID VALVE

C112859E01
  1. Install the shift solenoid valve S2 with the bolt.

    Torque:
    10 N*m{ 100 kgf*cm , 7 ft.*lbf }

  1. Install the shift solenoid valve S1 with the bolt.

    Torque:
    6.4 N*m{ 65 kgf*cm , 56 in.*lbf }

  1. Install the shift solenoid valve SR with the 2 bolts.

    Torque:
    6.4 N*m{ 65 kgf*cm , 56 in.*lbf }

  1. Install the shift solenoid valves SLU and SL2 with the 2 pins, lock plate and bolt.

    Torque:
    6.4 N*m{ 65 kgf*cm , 56 in.*lbf }

  1. Install the shift solenoid valves SLT and SL1 with the 2 pins, lock plate and bolt.

    Torque:
    6.4 N*m{ 65 kgf*cm , 56 in.*lbf }

← DISASSEMBLY (from Jul 2007)INSTALLATION (from Jul 2007) →