ADJUSTMENT
Removal / installation · Vehicles built Jul 2007 – Jul 2009
| 1. DRAIN ENGINE COOLANT |
![]() ![]() |
- CAUTION:
- To avoid the danger of being burned, do not remove the radiator cap while the engine and radiator are still hot. Thermal expansion will cause hot engine coolant and steam to blow out from the radiator.
Remove the service hole cover from the engine under cover.
Install a vinyl hose onto the drain on the radiator side.
Fix the vinyl hose with tape.
Loosen the 3 drain plugs on the engine and radiator, and drain the coolant.

Remove the radiator cap.
Drain the coolant from the reservoir tank.
Tighten the 3 drain plugs.
- Torque:
- 13 N*m{ 130 kgf*cm , 9 ft.*lbf } for the engine
Remove the vinyl hose from the radiator.
| 2. REMOVE V-BANK COVER |
![]() ![]() |
Remove the 2 nuts, then remove the V-bank cover.
| 3. REMOVE AIR CLEANER ASSEMBLY |
![]() ![]() |
Disconnect the No. 2 ventilation hose.
Disconnect the vacuum hose.

Disconnect the mass air flow meter connector.
Disengage the 2 wire harness clamps.
Loosen the 2 hose clamps.

Remove the 2 bolts.
Disconnect the air cleaner hose and remove the air cleaner.
| 4. REMOVE THROTTLE BODY BRACKET |
Remove the 2 bolts and the throttle body bracket.

| 5. REMOVE OIL BAFFLE PLATE |
Remove the bolt and the oil baffle plate.

| 6. REMOVE NO. 1 SURGE TANK STAY |
Remove the 2 bolts and the No. 1 surge tank stay.

| 7. REMOVE NO. 2 SURGE TANK STAY |
Remove the 2 bolts and the No. 2 surge tank stay.

| 8. REMOVE INTAKE AIR SURGE TANK |
Disconnect the 2 water by-pass hoses.

Disconnect the fuel vapor feed hose.

Disconnect the ventilation hose.

Disconnect the 2 VSV connectors.

Disconnect the throttle body with motor connector.
Separate the 3 wire harness clamps and the hose clamp.
Remove the 2 nuts.

Using a socket hexagon wrench 8, remove the 4 bolts, intake air surge tank and the gasket.
| 9. REMOVE IGNITION COIL ASSEMBLY |
![]() ![]() |
For Bank 1:
Disconnect the 3 connectors.
Remove the 3 bolts, then remove the 3 ignition coils.
For Bank 2:

Disconnect the 3 connectors.
Remove the 3 bolts, then remove the 3 ignition coils.
| 10. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() ![]() |
Remove the 10 bolts, 3 seal washers, 2 nuts, cylinder head cover and gasket.
| 11. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY LH |
![]() ![]() |
Remove the 10 bolts, 3 seal washers, 2 nuts, cylinder head cover and gasket.
| 12. SET NO. 1 CYLINDER TO TDC/COMPRESSION |
![]() ![]() |
Turn the crankshaft pulley until its groove and the "0" timing mark of the timing chain cover are aligned.
Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing caps as shown in the illustration.

If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks above.
| 13. INSPECT VALVE CLEARANCE |
![]() ![]() |
Check the valves indicated in the illustration.
Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
- Valve clearance (Cold):
- Intake:
- 0.15 to 0.25 mm (0.006 to 0.010 in.)
- Exhaust:
- 0.29 to 0.39 mm (0.011 to 0.015 in.)
Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.
Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
- Valve clearance (Cold):
- Intake:
- 0.15 to 0.25 mm (0.006 to 0.010 in.)
- Exhaust:
- 0.29 to 0.39 mm (0.011 to 0.015 in.)
Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.
Turn the crankshaft 240° clockwise, and check the valves indicated in the illustration.

Using a feeler gauge, measure the clearance between the valve lifter and camshaft.
- Valve clearance (Cold):
- Intake:
- 0.15 to 0.25 mm (0.006 to 0.010 in.)
- Exhaust:
- 0.29 to 0.39 mm (0.011 to 0.015 in.)
Record any out-of-specification valve clearance measurements. They will be used later to determine the required replacement valve lifter.
| 14. ADJUST VALVE CLEARANCE |
![]() ![]() |
Set the No. 1 cylinder to TDC/compression.
Turn the crankshaft pulley until its groove and the "0" timing mark of the timing chain cover are aligned.
Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing caps as shown in the illustration.

If not, turn the crankshaft 1 complete revolution (360°) and align the timing marks as above.
Place paint marks on the No. 1 chain links corresponding to the timing marks of the camshaft timing gears.

Remove the No. 1 chain tensioner assembly.
Remove the No. 2 camshaft.
Remove the No. 2 chain tensioner assembly.
Remove the camshaft.
Remove the No. 4 camshaft sub-assembly.
Remove the No. 3 chain tensioner assembly.
Remove the No. 3 camshaft sub-assembly.
Remove the valve lifters.
Determine the replacement valve lifter size according to the following formulas and charts:

Using a micrometer, measure the thickness of the removed lifter.
Calculate the thickness of a new lifter so that the valve clearance comes within the specified value.
- T:
- Thickness of removed lifter
- A:
- Measured valve clearance
- N:
- Thickness of new lifter
- Intake:
- N = T + (A - 0.20 mm (0.008 in.))
- Exhaust:
- N = T + (A - 0.34 mm (0.013 in.))
Select a new lifter with a thickness as close as possible to the calculated value.
- HINT:
- Lifters are available in 35 sizes in increments of 0.020 mm (0.0008 in.), from 5.060 mm (0.1992 in.) to 5.740 mm (0.2260 in.).




- HINT:
- New lifter thickness [mm (in.)]
Lifter No.
Thickness
Lifter No.
Thickness
Lifter No.
Thickness
06
5.060 (0.1992)
30
5.300 (0.2087)
54
5.540 (0.2181)
08
5.080 (0.2000)
32
5.320 (0.2094)
56
5.560 (0.2189)
10
5.100 (0.2008)
34
5.340 (0.2102)
58
5.580 (0.2197)
12
5.120 (0.2016)
36
5.360 (0.2110)
60
5.600 (0.2205)
14
5.140 (0.2024)
38
5.380 (0.2118)
62
5.620 (0.2213)
16
5.160 (0.2031)
40
5.400 (0.2126)
64
5.640 (0.2220)
18
5.180 (0.2039)
42
5.420 (0.2134)
66
5.660 (0.2228)
20
5.200 (0.2047)
44
5.440 (0.2142)
68
5.680 (0.2236)
22
5.220 (0.2055)
46
5.460 (0.2150)
70
5.700 (0.2244)
24
5.240 (0.2063)
48
5.480 (0.2157)
72
5.720 (0.2252)
26
5.260 (0.2071)
50
5.500 (0.2165)
74
5.740 (0.2260)
28
5.280 (0.2079)
52
5.520 (0.2173)
Install the No. 3 camshaft sub-assembly.
Install the No. 3 chain tensioner assembly.
Install the No. 4 camshaft sub-assembly.
Install the camshaft.
Install the No. 2 chain tensioner assembly.
Install the No. 2 camshaft.
Install the No. 1 chain tensioner assembly.
Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the bearing cap as shown in the illustration.

| 15. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH |
Remove any old packing (FIPG) material.
- HINT:
- Do not drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

- Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or the equivalent
- NOTICE:
- Install the cylinder head cover within 3 minutes of applying the seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing must be removed and reapplied.
Install the seal washers onto the bolts.
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

- Torque:
- Bolt A:
- 10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
- Bolt B:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
- Nut:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
- HINT:
- Each bolt length is as follows.
Bolt
Length
A
25 mm (0.98 in.)
B
60 mm (2.36 in.)
| 16. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
Remove any old packing (FIPG) material.
- HINT:
- Do not drop any oil on the contact surfaces of the cylinder head, timing chain cover and cylinder head cover.
Apply a continuous bead of seal packing (diameter 2 to 3 mm (0.08 to 0.12 in.)) to the cylinder head and timing chain cover as shown in the illustration.

- Seal packing:
- Toyota Genuine Seal Packing Black, Three Bond 1207B or the equivalent
- NOTICE:
- Install the cylinder head cover within 3 minutes of applying the seal packing. Tighten the cylinder head cover bolts and nuts within 15 minutes of installing the cylinder head cover. Otherwise, the seal packing must be removed and reapplied.
Install the seal washers onto the bolts.
Install the cylinder head cover with the 10 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.

- Torque:
- Bolt A:
- 10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
- Bolt B:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
- Nut:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
- HINT:
- Each bolt length is as follows.
Bolt
Length
A
25 mm (0.98 in.)
B
60 mm (2.36 in.)
| 17. INSTALL IGNITION COIL ASSEMBLY |
![]() ![]() |
For Bank 1:
Install the 3 ignition coils with the 3 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
Connect the 3 ignition coil connectors.
For Bank 2:

Install the 3 ignition coils with the 3 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }
Connect the 3 ignition coil connectors.
| 18. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket onto the intake air surge tank.
Using a socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.

- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }
Install the 2 nuts.
- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }
Install the 3 wire harness clamps and hose clamp.

Connect the throttle body with motor connector.
Connect the 2 VSV connectors.
Connect the ventilation hose.

Connect the fuel vapor feed hose.

Connect the 2 water by-pass hoses.

| 19. INSTALL NO. 2 SURGE TANK STAY |
Install the No. 2 surge tank stay with the 2 bolts.

- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
| 20. INSTALL NO. 1 SURGE TANK STAY |
Install the No. 1 surge tank stay with the 2 bolts.

- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
| 21. INSTALL OIL BAFFLE PLATE |
Install the oil baffle plate with the bolt.

- Torque:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
| 22. INSTALL THROTTLE BODY BRACKET |
Install the throttle body bracket with the 2 bolts.

- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
| 23. INSTALL AIR CLEANER ASSEMBLY |
Install the air cleaner onto the throttle body.

Connect the air cleaner hose to the air cleaner.
Install the air cleaner with the 2 bolts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the mass air flow meter connector.

Engage the 2 wire harness clamps.
Connect the vacuum hose.
Connect the No. 2 ventilation hose.

| 24. ADD ENGINE COOLANT |
Pour coolant into the radiator until it overflows.
- Capacity:
Transmission
Capacity
Manual Transmission
9.4 liters (9.9 Us qts, 8.3 Imp. qts)
Automatic Transmission
9.8 liters (10.4 Us qts, 8.6 Imp. qts)
- NOTICE:
- Do not substitute plain water for engine coolant.
- HINT:
- Use of improper coolants may damage the engine cooling system.
- Use only TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
- New TOYOTA vehicles are filled with TOYOTA SLLC (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, TOYOTA SLLC is recommended.
- Use of improper coolants may damage the engine cooling system.
Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.
Install the radiator cap securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Warm up the engine until the cooling fan operates.
Set the air conditioning as follows while warming up the engine.
Item
Condition
Fan Speed
Any setting except OFF
Temperature
Toward WARM
Air Conditioning Switch
OFF
Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.
- NOTICE:
- Make sure that the radiator reservoir still has some coolant in it.
- Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
- If there is not enough coolant, the engine may burn out or overheat.
- Make sure that the radiator reservoir still has some coolant in it.
Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine to bleed the air.
- CAUTION:
-
When pressing the radiator hoses:
- Wear protective gloves.
- Be careful as the radiator hoses are hot.
- Keep your hands away from the fan.
- Wear protective gloves.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, repeat the operation until the coolant level remains at the full level.
Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.
| 25. INSPECT FOR COOLANT LEAK |
Fill the radiator with coolant and attach a radiator cap tester.
Pump it to 177 kPa (1.8 kgf/cm2 25.7 psi), then check for leakage.
| 26. INSPECT IGNITION TIMING |
- NOTICE:
- Turn all the electrical systems OFF.
- Conduct the inspection when the cooling fan motor is turned OFF.
- Turn all the electrical systems OFF.
Warm up the engine.
When using the intelligent tester:
Connect the intelligent tester to the DLC3.
Select the following menu items: Powertrain / Engine and ECT / Date List / IGN Advance.
Inspect the ignition timing during idling.
- Ignition timing:
- 7 to 24°CA BTDC during idling (Transmission in neutral position)
Check that the ignition timing advances immediately when the engine speed is increased.
When not using intelligent tester:

Using SST, connect the terminals 13 (TC) and 4 (CG) of the DLC3.
- SST
- 09843-18040
- NOTICE:
- Do not connect the terminals incorrectly as it causes breakage of the engine.
Remove the air cleaner.
Pull out the wire harness shown in the illustration.

Connect the tester probe of a timing light to the wire of the ignition coil connector for the No. 1 cylinder.
- NOTICE:
- Use timing light that detects the first signal.
- Use timing light that detects the first signal.
- After checking, wrap the wire harness with tape.
- After checking, wrap the wire harness with tape.
Inspect the ignition timing during idling.

- Ignition timing:
- 8 to 12°CA BTDC during idling (Transmission in neutral position)
Remove SST from the DLC3.
Inspect the ignition timing during idling.
- Ignition timing:
- 7 to 24°CA BTDC during idling (Transmission in neutral position)
Install the air cleaner.
| 27. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.

- Torque:
- 7.5 N*m{ 76 kgf*cm , 66 in.*lbf }







