2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009


1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

A126383
  1. Install the No. 1 vacuum switching valve with the bolt onto the intake air surge tank.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 vacuum hoses.

  1. Connect the connector.


2. INSTALL AIR CLEANER ASSEMBLY

  1. A075596E01
    Install the air cleaner onto the throttle body.

  1. Connect the air cleaner hose to the air cleaner.

  1. Install the air cleaner with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A075595E01
    Connect the mass air flow meter connector.

  1. Engage the 2 wire harness clamps.

  1. Connect the vacuum hose.

  1. A075594E01
    Connect the No. 2 ventilation hose.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }


4. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (Jul 2007 – Jul 2009)COMPONENTS (Aug 2009 – Oct 2010) →