INSTALLATION
Removal / installation · Vehicles built Jul 2007 – Jul 2009
| 1.
INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY |
 |
Install the No. 1 vacuum switching valve with the bolt onto the intake air surge tank.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
Connect the 2 vacuum hoses.
Connect the connector.
| 2.
INSTALL AIR CLEANER ASSEMBLY
|
 |
- Install the air cleaner onto the throttle body.
Connect the air cleaner hose to the air cleaner.
Install the air cleaner with the 2 bolts.
-
Torque:
- 8.0 N*m{
82 kgf*cm
, 71 in.*lbf
}
- Connect the mass air flow meter connector.
Engage the 2 wire harness clamps.
Connect the vacuum hose.
- Connect the No. 2 ventilation hose.
| 3.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 3.9 N*m{
40 kgf*cm
, 35 in.*lbf
}
| 4.
INSTALL V-BANK COVER
|
 |
- Install the V-bank cover with the 2 nuts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}