2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014


1. INSTALL STARTER ASSEMBLY

A128856
  1. Install the starter assembly with 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. A128855
    Connect the wire harness to the terminal 30, then install the nut.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }

  1. Connect the terminal 50 connector to the starter assembly.


2. INSTALL WIRE HARNESS

A128854
  1. Install the wire harness onto the cylinder block with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


3. INSTALL NO. 2 EXHAUST MANIFOLD STAY

A128840
  1. Install the No. 2 manifold stay with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }


4. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
  1. Install the No. 2 engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }

← REASSEMBLY (from Aug 2009)INSTALLATION (Aug 2009 – Oct 2010) →