INSTALLATION
Removal / installation · Vehicles built Jul 2007 – Jul 2009
Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014
| 1.
INSTALL STARTER ASSEMBLY |
 |
Install the starter assembly with 2 bolts.
-
Torque:
- 37 N*m{
377 kgf*cm
, 27 ft.*lbf
}
- Connect the wire harness to the terminal 30, then install the nut.
-
Torque:
- 5.9 N*m{
60 kgf*cm
, 52 in.*lbf
}
Connect the terminal 50 connector to the starter assembly.
| 2.
INSTALL WIRE HARNESS |
 |
Install the wire harness onto the cylinder block with the bolt.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
| 3.
INSTALL NO. 2 EXHAUST MANIFOLD STAY |
 |
Install the No. 2 manifold stay with the 3 bolts.
-
Torque:
- 40 N*m{
408 kgf*cm
, 30 ft.*lbf
}
| 4.
INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY |
 |
Install the No. 2 engine under cover with the 4 bolts.
-
Torque:
- 29 N*m{
296 kgf*cm
, 21 ft.*lbf
}
| 5.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 3.9 N*m{
40 kgf*cm
, 35 in.*lbf
}