2011-2016 FJ Cruiser · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built from Aug 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. INSTALL STARTER ARMATURE ASSEMBLY
  1. Install the starter armature to the starter yoke.


2. INSTALL STARTER BRUSH HOLDER ASSEMBLY
  1. Install the starter brush holder.

  1. A215926
    Connect the 4 brushes to the starter brush holder.

    1. Using a screwdriver, hold back the brush spring.

    2. Connect the brush to the starter brush holder.

      NOTICE:
      Check that the positive (+) lead wires are not grounded.

  1. Place a new O-ring in position on the commutator end frame.

  1. A219640
    Install the commutator end frame with the 2 screws.

    Torque:
    1.5 N*m{ 15 kgf*cm , 13 in.*lbf }


3. INSTALL MAGNET STARTER SWITCH ASSEMBLY
  1. Apply high temperature grease to the idle gear, steel ball, return spring, clutch roller and retainer.

  1. A222255
    Insert the steel ball into the starter clutch.

  1. A219639E01
    Insert the return spring into the starter clutch.
    Text in Illustration 
    *1
    Starter Drive Housing
    *2
    Starter Clutch
    *3
    Return Spring
    *4
    Idle Gear
    *5
    Retainer
    *6
    Clutch Roller

  1. Install the starter clutch, idle gear, retainer and clutch roller to the starter drive housing.

  1. A219638
    Install the starter drive housing to the magnet starter switch with the 2 bolts.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }


4. INSTALL STARTER YOKE ASSEMBLY
  1. Install a new O-ring to the groove of the starter yoke.

  1. A218208E03
    Install the starter yoke to the starter switch.
    Text in Illustration 
    *a
    Groove
    *b
    Claw

    HINT:
    Align the claw of the starter yoke with the groove of the starter switch.

  1. A219637
    Install the starter yoke to the starter switch with the 2 bolts.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }

  1. Connect the lead wire to terminal C with the nut.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }

← REASSEMBLY (Jul 2007 – Jul 2009)INSTALLATION (Jul 2007 – Jul 2009) →