2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

2. REMOVE V-BANK COVER

A126474
  1. Remove the 2 nuts, then remove the V-bank cover.


3. REMOVE DUTY VACUUM SWITCHING VALVE

G036125E01
  1. Disconnect the connector.

  1. Disconnect the fuel vapor feed hose.

  1. G036126E01
    Remove the bolt, then separate the vacuum switching valve from the intake air surge tank.

  1. Disconnect the hose, then remove the vacuum switching valve.

← COMPONENTS (from Aug 2009)REMOVAL (from Aug 2009) →