2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Aug 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. REMOVE V-BANK COVER

  1. A221454E02
    Raise the front of the V-bank cover to disengage the 2 pins.

  1. Remove the 2 V-bank cover hooks from the bracket.

  1. Remove the V-bank cover.

    Text in Illustration 
    *1
    Pin
    *2
    Hook


2. REMOVE PURGE VSV

  1. A223554
    Disconnect the purge VSV connector.

  1. Disconnect the No. 1 fuel vapor feed hose and fuel vapor feed hose.

  1. A223555
    Remove the bolt and purge VSV.

← REMOVAL (Jul 2007 – Jul 2009)INSPECTION (Jul 2007 – Jul 2009) →