INSTALLATION
Removal / installation · Vehicles built Jul 2007 – Jul 2009
Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014
| 1.
INSTALL FAN |
 |
Install the fan onto the coupling with the 4 nuts.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
| 2.
INSTALL FAN SHROUD
|
 |
Temporarily install the fan shroud together with the fluid coupling assembly with fan.
Temporarily install the fluid coupling assembly with fan with the 4 nuts.
Install the fan and generator V belt.
(Click here)
- Install the fan pulley with the 4 nuts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 16 ft.*lbf
}
- Install the bolt to the reserve tank.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Install the fan shroud with the 2 bolts.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Install the bolt to the reserve tank.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Connect the 2 oil cooler hoses with the 2 clamps (w/ automatic transmission).
- Connect the hose to the radiator reserve tank.
| 3.
INSTALL RADIATOR SUPPORT SEAL UPPER
|
 |
- Engage the 7 clips, then install the radiator support seal.
| 4.
INSTALL NO.1 ENGINE UNDER COVER SUB-ASSEMBLY
|
 |
Install the No. 1 engine under cover with the 4 bolts.
-
Torque:
- 29 N*m{
296 kgf*cm
, 21 ft.*lbf
}
| 5.
INSTALL V-BANK COVER
|
 |
- Install the V-bank cover with the 2 nuts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}