2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014


1. INSTALL FAN

A112113
  1. Install the fan onto the coupling with the 4 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


2. INSTALL FAN SHROUD
  1. Temporarily install the fan shroud together with the fluid coupling assembly with fan.

  1. Temporarily install the fluid coupling assembly with fan with the 4 nuts.

  1. Install the fan and generator V belt.
    (Click here)

  1. A129882
    Install the fan pulley with the 4 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

  1. A129885E01
    Install the bolt to the reserve tank.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the fan shroud with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the bolt to the reserve tank.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the 2 oil cooler hoses with the 2 clamps (w/ automatic transmission).

  1. A129881
    Connect the hose to the radiator reserve tank.


3. INSTALL RADIATOR SUPPORT SEAL UPPER

  1. A129880E01
    Engage the 7 clips, then install the radiator support seal.


4. INSTALL NO.1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


5. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (from Jul 2007)INSTALLATION (Aug 2009 – Oct 2010) →