2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2009 – Oct 2010

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 from Nov 2010


1. INSTALL KNOCK SENSOR

  1. A078438E15
    Install the 2 sensors with the 2 bolts as shown in the illustration.
    Text in Illustration 
    *a
    for Bank 2:
    *b
    for Bank 1:
    *c
    Engine Rear
    *d
    Top
    *e
    Engine Front

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 sensor connectors.


2. INSTALL NO. 1 WATER OUTLET PIPE
  1. Install the No. 1 water outlet pipe with the 2 nuts and bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 4 wire harness clamps.


3. INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1)
  1. Install the cylinder head (Click here).

← INSTALLATION (Jul 2007 – Jul 2009)INSTALLATION (from Nov 2010) →