2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2011 – Jul 2014

Versions by build date: Aug 2009 – Jul 2011 Aug 2011 – Jul 2014 from Aug 2014


1. INSTALL FRONT CRANKSHAFT OIL SEAL

A221100E01
  1. Apply MP grease to the lip of a new oil seal.

  1. Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.

    SST
    09226-10010  

    NOTICE:
    1. Keep the lip free from foreign matter.
    2. Do not tap the oil seal at an angle.


2. INSTALL CRANKSHAFT PULLEY

A076309E03
  1. Using SST, install the crankshaft pulley with the pulley set bolt.

    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    260 N*m{ 2651 kgf*cm , 192 ft.*lbf }


3. INSTALL OIL FILTER BRACKET
  1. Install the oil filter bracket and new gasket with the 2 nuts and bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


4. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY (w/ Oil Cooler)

A224742E02
  1. Connect the 2 hoses and water by-pass pipe.

    Text in Illustration 
    *a
    Upper
    *b
    Rear

    HINT:
    The direction of the hose clamp is indicated in the illustration.

  1. Install the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


5. INSTALL FAN SHROUD
  1. Install the fan shroud (Click here).


6. INSPECT FOR ENGINE OIL LEAK

7. INSPECT FOR COOLANT LEAK
← INSTALLATION (Aug 2009 – Jul 2011)INSTALLATION (from Aug 2014) →