2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2009 – Jul 2014 from Aug 2014


1. INSTALL SPARK PLUG
  1. Using a 16 mm spark plug wrench, install the 6 spark plugs to the cylinder head sub-assembly.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 6 ignition coil assemblies to the cylinder head cover sub-assembly with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 6 ignition coil assembly connectors.


3. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Click here

4. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Click here

5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE

  1. A227195E01
    Install the air cleaner cap with the 4 hinges.

  1. Install the No. 1 air cleaner hose with the clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    Text in Illustration 
    *a
    Protrusion
    *b
    Groove
    *c
    Top
    *d
    Front
    *e
    RH
    *f
    Paint mark of the hose

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the ventilation hose and vacuum hose.

    HINT:
    The direction of the hose clamp is indicated in the illustration.

  1. Engage the 4 wire harness clamps.

  1. Connect the MAF meter connector.


6. INSTALL V-BANK COVER
  1. Engage the 2 hooks to install the V-bank cover to the No. 1 V-bank cover bracket.

  1. Align the 2 cushions of the V-bank cover with the 2 pins and press down on the V-bank cover to engage the 2 cushions to the 2 pins.

← INSTALLATION (Aug 2009 – Jul 2014)COMPONENTS (Jul 2007 – Jul 2009) →