2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2014


1. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set to the cylinder head cover sub-assembly LH with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A288093E01
    Connect the air tube assembly to the No. 2 emission control valve set and slide the hose clip to secure it as shown in the illustration.
    Text in Illustration 
    *1
    Paint Mark of Air Tube Assembly
    *2
    Protrusion of No. 2 Emission Control Valve Set
    *a
    View A
    *b
    Upper of Vehicle
    *c
    LH Side of Vehicle

    HINT:
    Make sure the direction of the hose clip is as shown in the illustration.

  1. Connect the No. 2 emission control valve set connector.


2. INSTALL NO. 2 AIR TUBE

  1. A226792E03
    Install 2 new gaskets to the No. 2 air tube.
    Text in Illustration 
    *1
    Gasket
    *2
    No. 2 Air Tube

  1. Install the No. 2 air tube to the No. 2 emission control valve set and exhaust manifold sub-assembly LH with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


3. INSTALL PURGE VSV
(Click here)
← INSPECTION (from Aug 2014)COMPONENTS (from Aug 2014) →