INSTALLATION
Removal / installation · Vehicles built from Aug 2014
| 1.
INSTALL NO. 2 EMISSION CONTROL VALVE SET |
 |
Install the No. 2 emission control valve set to the cylinder head cover sub-assembly LH with the 3 nuts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
- Connect the air tube assembly to the No. 2 emission control valve set and slide the hose clip to secure it as shown in the illustration.
Text in Illustration
*1
|
Paint Mark of Air Tube Assembly
|
*2
|
Protrusion of No. 2 Emission Control Valve Set
|
*a
|
View A
|
*b
|
Upper of Vehicle
|
*c
|
LH Side of Vehicle
|
- HINT:
- Make sure the direction of the hose clip is as shown in the illustration.
Connect the No. 2 emission control valve set connector.
| 2.
INSTALL NO. 2 AIR TUBE |
 |
- Install 2 new gaskets to the No. 2 air tube.
Text in Illustration
*1
|
Gasket
|
*2
|
No. 2 Air Tube
|
Install the No. 2 air tube to the No. 2 emission control valve set and exhaust manifold sub-assembly LH with the 2 bolts and 2 nuts.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
| 3.
INSTALL PURGE VSV |
 |
(Click here)