2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2009 – Jul 2012

Versions by build date: Aug 2009 – Jul 2012 Aug 2012 – Jul 2014 from Aug 2014


1. INSTALL FUEL PUMP CONTROL ECU ASSEMBLY
  1. Engage the hook.

  1. Install the ECU with the 2 bolts.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }

    NOTICE:
    Do not use the ECU if it has been subjected to physical shocks such as being dropped, etc.

  1. Connect the 2 ECU connectors.

← REMOVAL (from Aug 2014)INSTALLATION (Aug 2012 – Jul 2014) →