2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Aug 2014


1. REMOVE PURGE VSV
(Click here)

2. REMOVE NO. 2 AIR TUBE

  1. A230693
    Remove the 2 bolts, 2 nuts and No. 2 air tube from the No. 2 emission control valve set and exhaust manifold sub-assembly LH.

  1. Remove the 2 gaskets from the No. 2 air tube.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.


3. REMOVE NO. 2 EMISSION CONTROL VALVE SET

  1. A223562
    Disconnect the No. 2 emission control valve set connector.

  1. Slide the hose clip and disconnect the air tube assembly from the No. 2 emission control valve set.

  1. A223564
    Remove the 3 nuts and No. 2 emission control valve set from the cylinder head cover sub-assembly LH.

← COMPONENTS (from Aug 2014)INSPECTION (from Aug 2014) →