CYLINDER HEAD GASKET > REMOVAL |
| 1. REMOVE TIMING CHAIN COVER SUB-ASSEMBLY |
Remove the timing chain cover (Click here).
| 2. SET NO. 1 CYLINDER TO TDC / COMPRESSION |
Temporarily tighten the crankshaft pulley bolt to the crankshaft.
![]() |
Turn the crankshaft clockwise to align the timing mark on the crank angle sensor plate with the RH cylinder block bore center line (TDC/compression).
| *1 | Crank Angle Sensor Plate |
| *a | RH Cylinder Block Bore Center Line |
| *b | Timing Mark |
![]() |
Check that the timing marks of the camshaft timing gears are aligned with the timing marks of the camshaft bearing caps as shown in the illustration.
If not, turn the crankshaft clockwise 1 revolution (360°) and align the timing marks as above.
| *a | Timing Mark |
| 3. REMOVE NO. 1 CHAIN TENSIONER ASSEMBLY |
![]() |
Move the stopper plate upward to release the lock, and push the plunger deep into the tensioner.
| *1 | Plunger |
| *2 | Stopper Plate |
| *a | Push |
| *b | Pin of 12.7 mm (0.05 in.) diameter |
Move the stopper plate downward to set the lock, and insert a pin of 1.27 mm (0.05 in.) diameter into the stopper plate hole.
![]() |
Remove the 2 bolts and No. 1 chain tensioner assembly from the cylinder head sub-assembly.
| 4. REMOVE CHAIN TENSIONER SLIPPER |
![]() |
Remove the chain tensioner slipper from the cylinder block sub-assembly.
| 5. REMOVE CHAIN SUB-ASSEMBLY |
![]() |
Turn the crankshaft counterclockwise 10° to loosen the chain sub-assembly of the crankshaft timing sprocket.
| *1 | Crank Angle Sensor Plate |
| *a | RH Cylinder Block Bore Center Line |
| *b | Timing Mark |
Remove the crankshaft pulley bolt from the crankshaft.
![]() |
Remove the chain sub-assembly from the crankshaft timing sprocket and place it on the crankshaft timing sprocket.
![]() |
Turn the camshaft timing gear assembly on bank 1 clockwise approximately 60° so that it is as shown in the illustration. Be sure to loosen the chain sub-assembly between the banks.
Remove the chain sub-assembly.
| *a | Bank 1 |
![]() | Clockwise Approximately 60° |
| 6. REMOVE NO. 1 IDLE GEAR SHAFT |
![]() |
Using a 10 mm hexagon wrench, remove the No. 2 idle gear shaft, No. 1 idle gear and No. 1 idle gear shaft from the cylinder block sub-assembly.
| 7. REMOVE NO. 1 CHAIN VIBRATION DAMPER |
![]() |
Remove the 2 bolts and No. 1 chain vibration damper from the cylinder head LH and cylinder block sub-assembly.
| 8. REMOVE NO. 2 CHAIN VIBRATION DAMPER |
![]() |
Remove the 2 No. 2 chain vibration dampers from the cylinder head sub-assembly and cylinder head LH.
| 9. REMOVE CRANKSHAFT TIMING SPROCKET |
![]() |
Remove the crankshaft timing sprocket from the crankshaft.
| 10. REMOVE CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 1) |
![]() |
While raising the plunger, insert a pin of 1.0 mm (0.0394 in.) diameter into the plunger hole to hold the No. 2 chain tensioner assembly.
| *1 | Plunger |
| *a | Pin of 1.0 mm (0.0394 in.) diameter |
| *b | Raise |
![]() |
Using SST to hold the hexagonal portion of each camshaft, loosen the bolts of the camshaft timing gear assembly and camshaft timing exhaust gear assembly RH.
| *a | Turn |
| *b | Hold |
Remove the 2 bolts from the camshaft and No. 2 camshaft.
Remove the camshaft timing gear assembly and camshaft timing exhaust gear assembly RH together with the No. 2 chain sub-assembly from the camshaft and No. 2 camshaft.
| 11. REMOVE NO. 2 CHAIN TENSIONER ASSEMBLY |
![]() |
Remove the bolt and No. 2 chain tensioner assembly from the camshaft housing sub-assembly RH.
| 12. REMOVE CAMSHAFT BEARING CAP (for Bank 1) |
![]() |
Check that the camshafts are positioned as shown in the illustration.
| *1 | Knock Pin |
| *a | Front View |
![]() |
Uniformly loosen and remove the 8 bolts in several steps and in the sequence shown in the illustration.
![]() |
Uniformly loosen and remove the 12 bolts in several steps in the sequence shown in the illustration.
Remove the 5 camshaft bearing caps from the camshaft housing sub-assembly RH.
Remove the camshaft and No. 2 camshaft from the camshaft housing sub-assembly RH.
| 13. REMOVE CAMSHAFT HOUSING SUB-ASSEMBLY RH |
![]() |
Using a screwdriver with its tip wrapped in protective tape, remove the camshaft housing sub-assembly RH by prying between the cylinder head sub-assembly and camshaft housing sub-assembly RH.
| *a | Protective Tape |
| *b | Pry |
| 14. REMOVE CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 2) |
![]() |
While pushing the plunger, insert a pin of 1.0 mm (0.0394 in.) diameter into the plunger hole to hold the No. 3 chain tensioner assembly.
| *1 | Plunger |
| *a | Pin of 1.0 mm (0.0394 in.) diameter |
| *b | Push |
![]() |
Using SST to hold the hexagonal portion of each camshaft, loosen the bolts of the camshaft timing gear assembly and camshaft timing exhaust gear assembly LH.
| *a | Turn |
| *b | Hold |
Remove the 2 bolts from the No. 3 camshaft sub-assembly and No. 4 camshaft sub-assembly
Remove the camshaft timing gear assembly and camshaft timing exhaust gear assembly LH together with the No. 2 chain sub-assembly from the No. 3 camshaft sub-assembly and No. 4 camshaft sub-assembly.
| 15. REMOVE NO. 3 CHAIN TENSIONER ASSEMBLY |
![]() |
Remove the bolt and No. 3 chain tensioner assembly from the camshaft housing sub-assembly LH.
| 16. REMOVE CAMSHAFT BEARING CAP (for Bank 2) |
![]() |
Check that the camshafts are positioned as shown in the illustration.
| *1 | Knock Pin |
| *a | Front View |
![]() |
Uniformly loosen and remove the 8 bolts in several steps and in the sequence shown in the illustration.
![]() |
Uniformly loosen and remove the 13 bolts in several steps and in the sequence shown in the illustration.
Remove the 5 camshaft bearing caps from the camshaft housing sub-assembly LH.
Remove the No. 3 camshaft sub-assembly and No. 4 camshaft sub-assembly from the camshaft housing sub-assembly LH.
| 17. REMOVE CAMSHAFT HOUSING SUB-ASSEMBLY LH |
![]() |
Using a screwdriver with its tip wrapped in protective tape, remove the camshaft housing sub-assembly LH by prying between the cylinder head LH and camshaft housing sub-assembly LH.
| *a | Protective Tape |
| *b | Pry |
| 18. REMOVE NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY |
Remove the 24 No. 1 valve rocker arm sub-assemblies from the cylinder head sub-assembly and cylinder head LH.
| 19. REMOVE VALVE LASH ADJUSTER ASSEMBLY |
Remove the 24 valve lash adjuster assemblies from the cylinder head sub-assembly and cylinder head LH.
| 20. REMOVE VALVE STEM CAP |
Remove the 24 valve stem caps from the cylinder head sub-assembly and cylinder head LH.
| 21. REMOVE CYLINDER HEAD SUB-ASSEMBLY |
![]() |
Using a 10 mm bi-hexagon wrench, uniformly loosen the 8 cylinder head bolts in the sequence shown in the illustration. Remove the 8 cylinder head bolts and plate washers.
Remove the cylinder head sub-assembly.
| 22. REMOVE CYLINDER HEAD LH |
![]() |
Uniformly loosen and remove the 2 cylinder head set bolts in several steps and in the sequence shown in the illustration.
![]() |
Using a 10 mm bi-hexagon wrench, uniformly loosen the 8 bolts in the sequence shown in the illustration. Remove the 8 cylinder head bolts and plate washers.
Remove the cylinder head LH.
| 23. REMOVE CYLINDER HEAD GASKET |
| 24. REMOVE NO. 2 CYLINDER HEAD GASKET |