Home › ENGINE › 1GR-FE ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > INSTALLATION

for Preparation Click here



1. INSTALL FLYWHEEL RING GEAR (for Manual Transmission)


A177670E02
  1. Using a torch, heat the ring gear evenly to approximately 200°C (392°F).
    Text in Illustration 
    *1
    Chamfer
    *2
    Ring Gear
    *3
    Flywheel

    NOTICE:
    Be careful not to overheat the ring gear.

  1. Using a brass bar, tap the flywheel ring gear onto the flywheel with its chamfered gear teeth facing the block.

    NOTICE:
    After installing, allow the ring gear to cool before handling.



2. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
  1. Install the engine mounting RH to the cylinder block sub-assembly with the 4 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



3. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
  1. Install the engine mounting bracket to the cylinder block sub-assembly with the 3 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



4. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


A223631E01
  1. Install a new O-ring to the engine oil level dipstick guide.
    Text in Illustration 
    *1
    New O-Ring

  1. Apply a light coat of engine oil to the O-ring.

  1. Push the engine oil level dipstick guide end into the guide hole.

  1. Install the engine oil level dipstick guide to the timing chain cover sub-assembly with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the engine oil level dipstick to the engine oil level dipstick guide.



5. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


A226495E01
  1. Temporarily install the V-ribbed belt tensioner assembly to the cylinder block sub-assembly and timing chain cover sub-assembly with the 5 bolts.
    Text in Illustration 
    V100135
    Bolt A
    V100136
    Bolt B

    Bolt Length:
    Item
    Length
    A
    70 mm (2.76 in.)
    B
    33 mm (1.30 in.)

  1. Tighten bolts 1 and 2 in numerical order.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

  1. Tighten the other bolts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



6. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY


A223006
  1. for Cover Separate Type:
    Install the 2 idler pulley cover plates, 2 No. 2 idler pulley sub-assemblies and 2 No. 2 idler pulley cover plates to the timing chain cover sub-assembly with the 2 bolts.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }

  1. for Cover Integrated Type:
    Install the 2 No. 2 idler pulley sub-assemblies to the timing chain cover sub-assembly with the 2 bolts.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }



7. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY


A076438E01
  1. Install the No. 1 idler pulley sub-assembly to the timing chain cover sub-assembly with the bolt.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }

    HINT:
    "DOUBLE" is marked on the No. 1 idler pulley sub-assembly to distinguish it from the No. 2 idler pulley sub-assembly.



8. INSTALL INTAKE MANIFOLD


    A221467E01
  1. Install the new No. 1 intake manifold to head gasket and No. 2 intake manifold to head gasket to the cylinder head sub-assembly.
    Text in Illustration 
    *1
    No. 1 Intake Manifold To Head Gasket
    *2
    No. 2 Intake Manifold To Head Gasket
    *a
    Bank 2 Identification Mark
    V100135
    Front of Vehicle

    NOTICE:
    1. When installing the No. 1 intake manifold to head gasket and No. 2 intake manifold to head gasket, pay attention to the Bank 1 and Bank 2 sides.
    2. Align the port holes of the gasket and cylinder head sub-assembly.

  1. Temporarily install the intake manifold to the cylinder head sub-assembly with the 4 nuts and 6 bolts.



    A221466E03
  1. Install and uniformly tighten the 4 nuts and 6 bolts in several steps in the sequence shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the wire harness clamp bracket to the intake manifold with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 70 in.*lbf }



9. INSTALL FUEL INJECTOR ASSEMBLY


    A223045E02
  1. Install a new insulator onto each fuel injector.
    Text in Illustration 
    *1
    New Insulator
    *2
    New O-Ring

  1. Apply a light coat of spindle oil or gasoline to each new O-ring and install one onto each fuel injector.



    A223046E02
  1. Install the 6 injectors.
    Text in Illustration 
    *1
    Connector
    V100135
    Outward
    V100136
    Turn
    V100137
    Push

    1. While turning each fuel injector left and right, install it onto the fuel delivery pipe.

      HINT:
      Perform "Inspection After Repairs" after replacing the fuel injector assembly (Click here).

    2. Position the fuel injector connectors facing outward.



10. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    A223047E02
  1. Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
    Text in Illustration 
    *a
    Turn

  1. Temporarily install the 6 bolts, which are used to hold the fuel delivery pipe, to the intake manifold.

  1. Check that the fuel injectors rotate smoothly.

    HINT:
    If the fuel injectors do not rotate smoothly, replace the O-ring of any injector that does not rotate smoothly.

  1. Position the fuel injector connectors facing outward.

  1. Tighten the 6 bolts, which are used to hold the fuel delivery pipe, to the intake manifold.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 6 fuel injector connectors.



11. INSTALL FUEL PIPE SUB-ASSEMBLY
  1. Install the No. 1 fuel pipe and No. 2 fuel pipe to the cylinder head cover sub-assembly LH with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 fuel pipes to the fuel delivery pipe sub-assembly (Click here).



12. INSTALL REAR CYLINDER HEAD COVER
  1. Temporarily install the cover with the 3 bolts.



    A224695E01
  1. Tighten the 3 bolts in the sequence shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



13. INSTALL IGNITION COIL ASSEMBLY

HINT:
Perform "Inspection After Repairs" after replacing the ignition coil assembly (Click here).

  1. Install the 6 ignition coil assemblies to the cylinder head cover sub-assembly and cylinder head cover sub-assembly LH with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



14. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
  1. Install the No. 2 emission control valve set to the cylinder head cover sub-assembly LH with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



15. INSTALL EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
  1. Install the emission control valve set to the cylinder head cover sub-assembly with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



16. INSTALL HEATER WATER HOSE ASSEMBLY


A225929E01
  1. Install the heater water hose assembly and connect the 2 hoses to the No. 1 water outlet pipe and rear water by-pass joint.
    Text in Illustration 
    *a
    View A
    *b
    View B
    *c
    RH
    *d
    Rear

    HINT:
    The direction of the hose clamp is indicated in the illustration.